spot_imgspot_img

Top 5 This Week

spot_img

Related Posts

NHAI will develop Guwahati Ring Road at BOT (Toll) mode at a total cost of Rs 5,729 crore

Signed a concession agreement with Messrs Dinesh Chandra R Agarwal Infrakon Private Limited for implementation

National Highways Authority of India (NHAI) has signed a concession agreement with Messrs Dineshchandra R. Aggarwal Infrakon Private Limited in the presence of NHAI President Mr. Santosh Kumar Yadav and senior NHAI officials, in the presence of senior officials of NHAI. The 121 km long Guwahati Ring Road will be developed at a total cost of Rs 5,729 crore on build operat toll (BOT) mode with zero grant. The concession period of the contract, including a four -year construction period, is 30 years. To speed up the project, Assam State Government will bear 50 percent of the land costs, provide a rebate from royalty on the set and contribute about Rs 1,270 crore to give a share of the state in GST. Thus, the gross project cost is around Rs 7,000 crore.

Guwahati Ring Road project will have three blocks including a 56-km long 4-lane access-controlled northern Guwahati bypass, NH 27 to widen the existing 8 km bypass from four lane to six lanes and improve the existing 58 km long bypass on NH 27. It is important that a 3 km long bridge will also be built on the Brahmaputra River as a part of the project.

Guwahati Ring Road will provide uninterrupted connectivity to long distance traffic on the East-West Corridor of NH-27, which is the entrance to the north-eastern region of the country. The development of Ring Road will help reduce the congestion of Guwahati city and neighboring north-eastern states by bypassing major traffic coming from West Bengal/Bihar to Silchar, Nagaland and Tripura. The project will also provide uninterrupted connectivity to major cities of the region including Siliguri, Silchar, Shillong, Jorhat, Tejpur, Jogigofa and Barpeta.

The Government of India is encouraging public private participation for build-operate-transfer (BOT) projects. To encourage adopting projects on BOT mode, several amendments have been made recently in the Model Concession Agreement (MCA) of BOT (toll) and provisional BOT (toll). This is the first contract signed on the basis of the revised model concession agreement, which will pave the way for more such contracts.

As a part of the ‘Vision 2047’ of the Government of India, a large number of high-speed corridors have been envisaged. Strong public private partnership in the development of road sector will play an important role in realizing this vision and will also contribute significantly to the development and maintenance of the world class National Highway Network in the country.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Popular Articles